Construction of a new railway bridge over the Tamiš river
Location
Tamiš river (Pančevo – Zrenjanin railway)
Investor
Serbian Railways Infrastructure (Infrastruktura železnice Srbije A.D.)
Status
Completed
Period izvođenja
05.2024 – 09.2025

As the main contractor, we delivered the construction of a new steel bridge with a total length of 122 metres (three spans of 40 m). The project was carried out on a turnkey basis (design + procurement + construction).

Tomaševac bridge – Tamiš

Scope of works:

  • Construction of the railway substructure and earthworks
  • Construction of service roads to the site
  • Transition zones using cement stabilisation
  • River training works on the Tamiš
  • Axial length of track reconstruction: 1,420 m
Tomaševac bridge – TamišTomaševac bridge – Tamiš

Section: Pančevo Glavna – Zrenjanin – Kikinda