As the main contractor, we delivered the construction of a new steel bridge with a total length of 122 metres (three spans of 40 m). The project was carried out on a turnkey basis (design + procurement + construction).

Scope of works:
- Construction of the railway substructure and earthworks
- Construction of service roads to the site
- Transition zones using cement stabilisation
- River training works on the Tamiš
- Axial length of track reconstruction: 1,420 m


Section: Pančevo Glavna – Zrenjanin – Kikinda