In 2023 and 2024 we successfully delivered a project to build and reconstruct city roads. Particular attention was paid to the quality of the subgrade, using stabilisation of the existing base with a hydraulic binder, which guarantees a long-lasting pavement.

Scope of works:
- Total asphalted area: 18,352 m²
- Construction of one-way roads (cross-section width 3.5 m)
- Construction of two-way roads (cross-section width 5.5 m)
- Shoulders and drainage

