Novi Sad – Subotica railway (Bačka Topola – Žednik)

Novi Sad – Subotica railway (Bačka Topola – Žednik)

High-speed railway Novi Sad – Subotica – border (Kelebija), LOT NS-II
Location
Novi Sad – Subotica
Investor
Shandong Luqiao Group Co. Ltd (client)
Status
Completed
Period izvođenja
2022 – 2024

As a strategic partner of Shandong Luqiao Group, Extra Auto Transport carried out complex construction works on the second section of the high-speed railway. The project covered a wide range of activities, from earthworks infrastructure to utility installations.

Novi Sad – Subotica railway (Bačka Topola – Žednik)

Scope of works:

  • Construction of 11.9 km of railway substructure
  • Embankments for retaining walls
  • Asphalt pavement in underpasses
  • Landscaping for wildlife crossings (ecological passages)
  • Construction of power supply and signalling ducts
  • Construction of the complete water supply and sewer network