Niš railway bypass

Niš railway bypass

Part of the Niš – Dimitrovgrad railway modernisation project
Location
Niš – Dimitrovgrad
Investor
Serbian Railways Infrastructure (Infrastruktura železnice Srbije A.D.)
Status
In progress
Period izvođenja
08.2024 –

A project of national importance financed by the EIB and the budget of the Republic of Serbia. The works are carried out to the highest international standards (FIDIC Yellow Book), which means a design-and-build approach.

Niš railway bypass

Company role: Extra Auto Transport is the consortium leader for the construction of a new single-track electrified railway with a length of 22.4 km.

Route: The route starts at Niš Marshalling Yard station and ends at Sićevo station, with new stations being built: Niš-Sever, Pantelej and Vrežina.

Niš railway bypassNiš railway bypass

Scope of works:

  • Construction of the railway superstructure and substructure.
  • Construction of structures (bridges, overpasses).
  • Power facilities and overhead contact line.
  • Signalling, safety and telecommunications systems.