Kovačica wind farm

Kovačica wind farm

Infrastructure for the "Kovačica" wind farm
Location
Kovačica
Investor
CJR Renewables Limited d.o.o., Belgrade branch
Status
Completed
Period izvođenja
2017 – 2019

As a reliable partner of the global company CJR Renewables, we carried out extensive infrastructure works for one of the largest wind farms in Serbia. The project required an exceptionally high subgrade bearing capacity for special transports and cranes.

Kovačica wind farm

Scope of works:

  • Access roads: total area 177,531 m²
  • Crane hardstands: total area 58,882 m²
  • Technology: soil stabilisation with hydraulic binders (cement)
  • Total delivered: over 23 hectares of stabilised surfaces
Kovačica wind farmKovačica wind farm

Access roads and crane hardstands

Kovačica wind farm | Extra Auto Transport References
Kovačica wind farm | Extra Auto Transport References
Kovačica wind farm | Extra Auto Transport References