As a strategic partner of PE "Electric Power Industry of Serbia", we carried out complex road infrastructure works for EPS's first wind farm. The works included building a network of access and internal roads at demanding mine-site locations.

Scope of works:
- Construction of internal roads with a total length of 14.2 km
- Construction of junctions with the state road
- Works at the Drmno, Ćirikovac and Petka spoil dumps and the Klenovnik site
- Soil stabilisation for heavy machinery (wind turbine transport)

