In 2023 we successfully reconstructed a road route in the City of Sombor. The special feature of the project was that the works were carried out on the crest of a flood-defence embankment, which required exceptional precision in preparing the subgrade.

Scope of works:
- Preparatory works and construction of the sub-base (stone and gravel)
- Placement of the bituminous base course (BNS 22, d = 7 cm)
- Placement of the asphalt concrete wearing course (AB 11, d = 4 cm)
- Total asphalted area: 29,000 m²
- Installation of complete road signage